The chronicles of my time in design...and the cool stuff i get to make.
Saturday, August 29, 2009
finished frame after being powdercoated "lazer diamond".
once the main tubes were mitered, the front triangle was cold fit.
The beginning of my new bike. I took a class on bicycle frame fabrication...and now i gots a bike. I started with some research for inspiration, some butted tubing, cast lugs, and a drawing of my frame geometry.
This is the poster i designed for the presentation.
another view of the undertail. the paint came out really nice, and so did the fitment.